Drywall, paint, flooring, ceilings, tile, wall coverings. BidEngine's finishes engine reads wall types, room finish schedules, and ceiling plans to deliver square footage and finish-level pricing your PM can sign.
The quantities your estimator looks for first — counted, sized, and priced from the plan set.
Wall and ceiling drywall by side count and Type X / regular per fire rating.
Painted surface area by sheen, primer requirements, and number of coats.
Carpet, LVT, sheet vinyl, polished concrete, and tile by room from the finish schedule.
Wall base, casing, chair rail, and crown molding by linear foot.
Door count by size, fire rating, and hardware group.
ACT grid square footage, tile type, and special panels (clouds, baffles, drop edges).
A realistic line-item snapshot of a Division 09 package generated by BidEngine. Real units, real rates, ready to send.
Finishes bids live or die on the room finish schedule — which sub do you trust to read 80 rooms across 20 sheets and not miss the conference room with the special wallcovering? BidEngine reads the finish schedule and wall types together, then reconciles them against the floor plan so you don't lose money on the rooms where Sheet A-201 says one thing and the schedule says another.
If you self-perform multiple trades, every division below uses the same upload, the same dashboard, and the same proposal format.
Upload your plan set. BidEngine writes the bid. Send it to the GC the same day.
Book a Free Demo