Slabs on grade, footings, walls, sidewalk, curb. BidEngine's concrete engine pulls cubic yards, square footage, rebar tonnage, and finishing quantities directly off your structural and site sheets.
The quantities your estimator looks for first — counted, sized, and priced from the plan set.
Square footage of slab pours by thickness, PSI rating, and finish (broom, troweled, stamped).
Cubic yards for spread footings, grade beams, foundation walls, and piers.
Reinforcement tonnage by bar size — #3 ties through #11 verticals.
Linear feet of curb & gutter, sidewalk pours, and integral ramps.
Drilled piers, caissons, and column footings counted off the foundation plan.
Pump truck rates, finish crew hours, and curing budget rolled into the line.
A realistic line-item snapshot of a Division 03 package generated by BidEngine. Real units, real rates, ready to send.
Concrete bids hinge on three numbers your competitors get wrong: cubic yards (which depends on slab thickness, footing depth, and waste factor), rebar pounds by bar size, and the realistic pump hours for the pour schedule. BidEngine's concrete engine reads thickness off the structural notes, applies your local waste factor, and pulls rebar schedules from the typical details — so the takeoff that used to take a half-day is done before lunch.
If you self-perform multiple trades, every division below uses the same upload, the same dashboard, and the same proposal format.
Upload your plan set. BidEngine writes the bid. Send it to the GC the same day.
Book a Free Demo